Page 56 of 168, showing 10 records out of 1,672 total
all ULBs in the field of municipal tax administration, finan cial management, infrastructure development, town planning, urban health and sanitation, environment management and programmes for urban poor etc .The Directorate has the responsibility to supervise the function of the ULBs, work out......
and Chart), immunisation schedules, danger signs, Post-natal (PN) advice etc 4 4 5 6 Drug store open after OPD hours 6 7 0 7 Barrier free access environment (viz. ramp, hand railing, etc.) for easy access to handicapped and elderly person 6 7 0 Accessibility of services to users in test......
room 6 0 0 Building equipped with fire protection measures 0 4 2 Barrier free access environment (viz. Ramp, hand railing etc.) for easy access to handicapped and elderly person 0 7 0 Source: Physical verification. Audit Report on Impact of NRHM on RCH in Assam for the year ended 31 March......
43 Delay in Commissioning of Merry-Go-Round Rail System 2.1.13.3 43-44 Failure in taking delivery of wagons for the MGR system 2.1.13.4 44-45 Environment Management 2.1.14 45 Ash disposal 2.1.14.1 45 Failure to instal online Continuous Stack Emission Monitoring Systems and online effluent......
This could adversely affect th e overall business environment of the State. Consequently the State may jeopardise its position as seventh rank holder in ‘Ease of Doing Business’ as reported by the World Bank in its report for the period ending June 2016. 2.1.1 Introduction Tenughat Vidyut......
This could adversely affect th e overall business environment of the State. Consequently the State ma y jeopardise its position Audit Report on Public Sector Undertakings for the year ended 31 March 2016 xii as seventh rank holder in ‘Ease of Doing Business’ as reported by the World Bank in......
cadre and inadequate garbage disposal vehicles in t he test checked ULBs affected the cleanliness of cities and posed a thre at to environment and health of residents. In audit survey conducted with 741 households livin g within the service network of 10 test checked ULBs, 91......
per cent to 5.81 per cent of the requirement only as prescribed in the SWM manual which affected th e cleanliness of cities and posed a threat to environment and health of residents. (Paragraph 4.1.12) 4.1.1 Introduction The 74 th Constitutional Amendment Act (CAA) broadened the range of......
Chairperson elected amongst its members Finance, Audit and Planning & Development Committee Cooperative Committee Forest and Environment Committee Communication and Works Committee GRAM PANCHAYAT General Administration Committee Five members of each of the Committee shall be elected by the......
supervisory/sweeper cadre and inadequate garbage disposal vehicles in the test checked ULBs affected the cleanliness of cities and posed a threat to environment and health of residents. In audit survey conducted with 741 households living within the service network of 10 test chec ked ULBs, 91......
Thus, the 41 (1) Water supply by Public Health and Engineering D epartment except in Patna (2) Urban forestry and protection of environment (3) Fi re services (4) promotion of Art & Culture and (5) Primary education by Education Depa rtment. Chapter – III: An overview of functioning of Urban......
45; 193-203 & 220-230 Public health, sanitation conservancy and solid waste management 7. 45; 250-261 & 262-268 Urban forestry, protection of the environment and p romotion of ecological aspects 8. 287 Safeguarding the interests of weaker sections of so ciety, including the handicapped and......
the directions of Government of India (GoI ) (May 2011) and the Hono urable Supreme Court (February 2012) regarding preparation of mining plan and environment management plan were not impl emented in respect of Granite Building Stone (GBS) permit holders till the period covered in Audit.......
Clearances (EC)/No Objection Certificates (NOC) required for issuing quarrying permits/leases include:- EC from the Ministry of Environment and Forest (MoEF)/ State level Environment Impact Assessment Authority (SEIAA), wherever applicable. NOC from the District Collector......
include issue of Integrated Consent to Operate (ICO) to HBs which is mandatory according to provisions contained in the Water Act, 1974, and the Environment Protection Act, 1986, and periodical inspections to check whether the prescribed parameters of sewage/effluents discharged from the......
the directions of Government of India (Gol) (May 2011) and the Honourable Supreme Court (February 2012) regarding preparation of mining plan and environment management plan were not implemented in respect of Granite Building Stone (GBS) permit holders till the period covered in Audit.......
of Ports (Directorate) in the departmental land at Valiyathura at a cost of? 75 lakh, in order to provide better facilities and modem working environment to the staff and to save money on monthly rent. The Department entrusted the work to Kerala Police Housing and Construction Corporation......
and Family Welfare, (ii) Food, Public Distribution and Consumer Affairs, (iii) Industries, Mines and G eology, (iv) Home, (v) Welfare, (vi) Forest, Environment and Climate Chang e, (vii) Information and Public Relation, (viii) Agriculture, Animal Husband ry and Co-operative, (ix) Building......
Implementation of Business Re forms (September 2015) 7 Setting up a business, Allotment of land and obtain ing construction permit, Complying with environment procedures, Complying with labour rules, obtaining infrastructure related utilities, Registering & Complying with tax procedures,......
Not in top five 3 Complying with environment procedures Consent to Establish under Water (Prevention and Co ntrol of Pollution) Act, 1974, Consent to Establish under Air (Preventi on and Control of Pollution) Act, 1981, Authorisation under Hazardous Waste (Management and Handling) Rules, 1989,......
Rules also provide for use of covered vehicles for transportation of waste and garbage as it should not be visible to public or exposed to open environment. Audit noticed that no mechanism was in place in nine 24 ULBs to handle and dispose- off the wastes in accordance with the provisions of......
The perspective plan was to be followed by preparation of respective development plans integrating land use with services, urban transport and environment management for every five years plan period. It was seen that CDP for Jammu and Srinagar Cities were formulated (2006-07) but were never......
negligence which results in substantial loss of life or human suffering or damage to and destruction of, property, or damage to, or degradation of, environment, and is of such a nature or magnitude as to be beyond the coping capacity of the community of the affected area.” The Act provides for......