Page 68 of 168, showing 10 records out of 1,672 total
In the age of digital environment, the Board has failed to exploit the po tential of IT for monitoring of arrears. Even after being pointed o\bt, no acco\bn tability is being fixed in specific cases which can act as deterrent. Rep\brt N\b. 3 \bf 2017 (Indirect Taxes-Central Excise) 51......
to San Francisco due to the steep fall in fuel prices, the product p er se was good and due to changes in the circumstances and the high cost environment, th e operations with LR became unprofitable. The reply of the Management’s was not tenable in vi ew of the following: 1. The original......
Management replied (February 2016) that a number of engines were dropped much before time due to harsh environment almost simultaneously resulting in delays and prolonged grounding and the company had to send these engines abroad. Moreover, shortage of spares on certain occasions was also a......
(Paragraphs 1.2.1, 1.2.2 and 1.2.3) Mosquito breeding can be controlled through environment modification that includes solid waste management, proper sanitation and regulation of construction sites, tyre markets, etc. However, no institutional mechanism was in place either in the......
Upgradation of public conveniences, environmental improvement, landscaping and streetscaping; and e. Engineering improvement of civic services viz. water and electricity supply, drainage and sewer system. The Council approved the Project Report (November 2007) and decided to fund the project......
at KL Block, SaritaVihar 6,319 sqm (08/2007) GNCTD approved (July 2013) PE of ` 109.39 crore submitted by PWD but construction did not commence as environment clearance was received only in March 2015. In July 2015, consultant submitted revised proposal for 240 beds based on revised FAR. There......
Regulated Environment Buildings, and There was variation in quantities valuing (iii) C/o Academic Block at DIPSAR t 70.58 crore in these three works. 98 Chapter-Ill: Compliance Audit Sl.No. Name of work Remarks 2 (i) C/o Shaheed Sukhdev College of There was delay in submission of drawings......
100 Bedded 6,319 sqm GNCTD approved (July 2013) PE of? 109.39 crore submitted by PWD Hospital at (08/2007) but construction did not commence as environment clearance was KL Block, received only in March 2015. In July 2015, consultant submitted revised SaritaVihar proposal for 240 beds based on......
18 Construction of Prison Complex including Housing at Mandoli, Delhi SH: Regulated Environment Buildings (B- 121) 20.5.2008/ 19.11.2010 Work completed on 31.3.2016 (1,957 days) Reply not received. 19 C/o Academic Block at DIPSAR, Pushp Vihar (B-121) 1.6.2014/ 30.9.2015 Work completed on......
Report of the Comptroller and Auditor General of India on Environmental Clearance and Post Clearance Monitoring Union Government Ministry of Environment, Forest and Climate Change Report No. 39 of 2016......
Report No. 39 of 2016 33 3.1 Introduction Environment Clearances (ECs) are granted for Catego ry A projects by MoEF&CC after following the due processes as per EIA Notification 2006. EC is......
which had been granted Environ\bental Clearance between calendar years 2008 to 2012 to check the \fost Environ\bental Clearance \bonitoring. Environment Impact A\f\fe\f\fment proce\f\f The database for the \frojects granted Environ\bental Clearance by the Ministry as initially received......
Report No. 39 of 2016 7 2.1 Introduction Environment Impact Assessment (EIA) exercise is to be carried out before any project is undertaken. EIA Notification of 2006 and its amendm ents......
Report No. 39 of 2016 1 1.1 Background Article 48 A of the Constitution of India brings ou t that the State shall endeavor to protect and improve the environment and to safeguar d the forests and wildlife in the country. Article 51 A(g) of the Constitution of Ind ia enjoins upon the citizens of......
Report No. 39 of 2016 49 4.1 Introduction Environment Clearances (EC) are granted for Categor y A projects by MoEF&CC after following the due processes as per EIA Notification 2006. EC is......
Report No. 39 of 2016 83 7.1 Introduction Environmental Clearance (EC) is accorded along with conditions to be complied with by the PPs. The monitoring of the EC conditions is req uired to......
i Table o\b Content\f Content\f Page\f Pre\bace iii Executive Summary v Recommendation\f x Chapter 1 Introduction 1 Chapter 2 Proce\f\f o\b grant o\b Environment Clearance 7 Chapter 3 Compliance to General Environment Clearance Condition\f 33 Chapter 4 Compliance to Speci\bic Environment Clearance......
of an application seeking prior EC made in Form 1, by the concerned SEAC, for determining whether or not the project or activity requires fur ther environmental studies for preparation of an EIA, for its appraisal, prior to the grant of EC depending up on the nature and location specific of the......
Report No. 39 of 2016 71 5.1 Introduction Environmental Clearance (EC) is issued to Project P roponents (PPs) subject to general and specific conditions as per EIA Notification, 20 06.......
Report No. 39 of 2016 77 6.1 Introduction CPCB in collaboration with Indian Institute of Tech nology, Delhi, (IIT) had carried out comprehensive environmental assessment in 88 promin ent industrial clusters during 2009-10 based on the Comprehensive Environmental Po llution Index (CEPI)......
Report No. 39 of 2016 89 8.1 Introduction State Pollution Control Boards (SPCBs) are responsi ble for implementing environmental legislations in the State, such as Water (Prevention and Control of Pollution) Act, 1974, Air (Prevention and Control of Pollution)......
Audit Report No. 37 of 2016-Union Government (Railways)-Railways Finances was laid on the table of both the Houses of Parliament on 10-03-2017 and has now become a public document. This Report provides an analytical review of the Accounts and...
( ER,ECR, SR and SER) and one Production unit ( RWF/Yellhanka) reported that there was lack of necessary validations and checks in the computerised environment (FMIS). ¾ FMIS was not introduced by CORE/Allahabad and it was stated that the same has been forwarded to CRIS for required......
Sciences , Rohtak 2.2 25 School Education Department Right of Children to Free and Compulsory Education Act 2009 2.3 40 Chapter 3 Compliance Audit Environment Department (Haryana State Pollution Control Board) Environment Clearance and Post Clearance Monitoring 3.1 53 Food and Drug......
CHAPTER 3 COMPLIANCE AUDIT Environment Department (Haryana State Pollution Control Board) 3.1 Environment Clearance and Post Clearance Monitoring There were instances of......
Civil Secretariat 2012 -13 2 3.2, 3.3 25 . Public Relation Department 2012 -13 1 3.9 26 . Welfare of SC and BC Department 2012 -13 1 3.21 27 . Environment (HSPCB) 2013 -14 2 3.5, 3.6 2014 -15 1 3.4 28 . Finance 2013 -14 1 3.7 29 . Horticulture 2013 -14 1 3.12 2014 -15 1 3.14 30 . Sports and......
PGIMS, Rohtak (ii) Work ing of Haryana State Agricultural Marketing Board (iii) Right of Children to Free and Compulsoty Education Act, 2009 and (iv) Environment Clearance and Post Clearance Monitoring. Report of Social, General and Economic Sectors (Non -PSUs) for the yea r ended 31 March 2016 4......
observed that continued l ack of internal control s in management of cash despite the matter being highlighted in previous Audit Report created an environment that exposed the Institute to risks of embezzlement a nd loss of funds. The Director of the Insti tute stated (August 2016) that the......
crore), IT-Cyber Park -Land acquisition (`145.84 crore), Kerala Social Security Mission (`124.58 crore), State Council for Science, Technology & Environment ( `106.65 crore), Kudumbasree (`75 crore), Co ntribution to Fishermen Welfare Fund (`54.63 crore), Kerala State Information Technology......
74.96 448.36 Industry and 175.73 169.73 345.46 Minerals 1937.17 Transport 2030.68 126.07 2156.75 Science, 111.91 Technology and 49.95 86.70 136.65 Environment 441.00 General Economic 221.02 244.15 465.17 Services 6398.00 Grants-in-aid and 3903.08 3903.08 Contributions II. Revenue Deficit......
crore), IT-Cyber Park-Land acquisition (T145.84 crore), Kerala Social Security Mission (T124.58 crore), State Council for Science, Technology & Environment ( 106.65 crore), Kudumbasree (75 crore), Contribution to Fishermen Welfare Fund (T54.63 crore), Kerala State Information Technology......
1,115.85 Energy 964.48 5.22 969.70 54.83 Indu stry and Minerals 3.48 139.66 143.14 34.92 Transport 15.94 32.17 48.11 3.23 Science, Technology and Environment 0.24 2.24 2.48 57.47 General Economic Services 13.3 3 48.56 61.89 4.77 Grants -in-aid and Contributions - 7.70 Nil 7.70 175.13 II......
1.5 5 Response to audit 1.6 8 Follow up on the Audit Reports 1.7 9 CHAPTER I I – PERFORMANCE AUDIT DEPARTMENT S OF SCIENCE, TECHNOLOGY AND ENVIRONMENT AND PUBLIC WORKS PUDUCHERRY POLLUTION CONTROL COMMITTEE Performance Audit on ‘Implementation of Environme ntal Laws in Union Territory......
CHAPTER II PERFORMANCE AUDIT _CHAPTER II_ This Chapter contains Performance Audit on ‘Implementation of Environmental Laws in Union Territory of Puducherry’. DEPARTMENTS OF SCIENCE, TECHNOLOGY AND ENVIRONMENT AND PUBLIC WORKS PUDUCHERRY POLLUTION......
The highlights of audit findings are given in the following paragraphs: 1.5.1.1 Performance Audit on ‘Implementation of Environmental Laws in Union Territory of Puducherry’ With an aim to control pollution and protect the environment, Government of India enacted Environment and Protection......
AGRICULTURE, EDUCATION, ELECTRICITY, PUBLIC WORKS AND SCIENCE, TECHNOLOGY AND ENVIRONMENT DEPARTMENTS RENEWABLE ENERGY A GENCY, PUDUCHERR Y 3.4 Implementation of Energy Conservation Act by Renewable Energy Agency, Puducherry 3.4.1 Introduction Union Territory Government of Puducherry (UT......
335 30 Revenue an d Disaster Management 136 375 31 Rural Development 22 84 32 Sainik Welfare 2 5 33 School Education 10 34 34 Science, Technology and Environment 33 97 35 Social Welfare 3 3 36 Stationery and Printing 50 206 37 Tourism 11 41 38 Town and Country Planning 74 335 39 Transport 136 375......
Fisheries and Fishermen Welfare, Home, Industries and Commerce, Law, Port, Public Works, Revenue and Disaster Management, Science, Technology and Environment, Stationery and Printing, Town and Country P lanning, Transport and Tourism. However, Departments of Animal Husbandry and Animal......