Jawaharlal Nehru National Solar Mission (JNNSM) was launched by GoI in January 2010, setting a target of 20000 MW solar power capacity by 2021-22. This target was enhanced to 100000 MW in June 2015. Though BHEL had been in the renewable en ergy sector since 1983, its production...
Jawaharlal Nehru National Solar Mission (JNNSM) was launched by Gol in January 2010, setting a target of 20000 MW solar power capacity by 2021-22. This target was enhanced to 100000 MW in June 2015. Though BHEL had been in the renewable energy sector since 1983, its production capacity...
outstanding as on 31 March 2016 2016 -17 2,257.33 1.53 2017 -18 4,942.44 3.34 2018 -19 9,597.73 6.49 2019 -20 12,598.96 8.52 2020 -21 11,181.11 7.56 2021 -22 14,500.00 9.80 2022 -23 17,996.81 12.16 2023 -24 20,749.15 14.02 2024 -25 24,350.00 16.46 2025 -26 29,775.00 20.1 2 Details not available...
12651.64 2017-18(2) 17344.68 7.69 17352.37 2018-19(3) 38540.45 6.96 38547.41 2019-20(4) 30636.28 6.17 30642.45 2020-21(5) 31796.54 16.85 31813.39 2021-22(6) 41210.54 24.43 41234.97 2022-23(7) 27500.00 368.36 27868.36 2023-24(8) 35848.70 158.69 36007.39 2024-25(9) 47441.50 38070.40 85511.90...
17 Item No. 3 of the Governing Board (GB) Meeting, he ld at Patna during 19-20 July 2012. Report No. 12 of 2017 59 2010-11 to 2021-22. Till March 2016, the University constructed boundary wall and called tenders for construction of Phase-I camp us of the University. Irregularity noticed in...
In a recent development, in order to achieve the target of 24400 RKM by 31 March 2021, IR has decided to assign RE projects to Indian Railway Construction Organization (IRCON), Rail India Technical and Economic Services Limited (RITES) (Railways’ PSUs) and Power Grid Corporation of India...
In August 2016, the target has been revised by Railway Board to cover 24,427 RKMs under electrified routes by 31 March 2021, including 12,710 RKMs in progress and 11,717 RKMs (out of 18,116 RKMs) of missing links between already electrified sections. 166,687 RKM include 58,825 RKM in Broad...
In a recent development, in orderto achieve the target of 24400 RKM by 31 March 2021, IR has decided to assign RE projects to Indian Railway Construction Organization (IRCON), Rail India Technical and Economic Services Limited (RITES) (Railways' PSUs) and Power Grid Corporation of India Limited...
--- 1.58 --- MoradabadLokmanya Tilak Jun-15 334 248653 113034 --- 1477 --- 1.31 --- MoradabadChhatrapati Shivaji Nov-15 441 252977 --- 102575 --- 2021 --- 1.97 MoradabadLokmanya Tilak Nov-15 508 402791 --- 101272 --- 2541 --- 2.51 1800 1167895 Sealdah Sealdah Jun-15 400 198837 90285 --- 2068...
--- 1.58 --- Moradabad Lokmanya Tilak Jun-15 334 248653 113034 --- 1477 --- 1.31 --- Moradabad Chhatrapati Shivaji Nov-15 441 252977 --- 102575 --- 2021 --- 1.97 Moradabad Lokmanya Tilak Nov-15 508 402791 --- 101272 --- 2541 --- 2.51 1800 1167895 Sealdah Sealdah Jun-15 400 198837 90285 --- 2068...
The report has also projected change in rainfall pattern during the period 2021-50 As Kudremukh NP, Nagarahole NP, Bhadra WLS, Bandipur NP, MM WLS, BRT . The Western Ghat region is also affected on account of climate change. 94 Intergovernmental panel on Climate change report 2013, Available at...
The report has also projected change in rainfall pattern during the period 2021-50 As Kudremukh NP, Nagarahole NP, Bhadra WLS, Bandipur NP, MM WLS, BRT 94 Intergovernmental panel on Climate change report 2013, Available at https://www.ipcc.ch/pdf/assessment-reDort/ar5/wgl/diaftsAVGlAR5-TS FOD...
from April 2016 ending in March 2021 and ITIA had agreed for the same. The payments made earlier towards FMS were being adjusted based on Service Level Agreement Audit Report in ESCOMs. Metering 2.2.15 . The Programme envisaged installation of Automatic Meter Reading (AMR) compatible...
from April 2016 ending in March 2021 and ITIA ha d agreed for the same. The payments made earlier towards FMS were being adjusted based on S ervice Level Agreement Audit Report in ESCOMs . Metering 2.2.1 5. The Programme envisaged installation of Automatic Meter Reading (AMR) compatible...
The loan amount along with interest was repayable in eight years upto December 2021 after allow ing a moratorium of 15 months (September 2012). The first installment of loan of ` 0.80 lakh was due in December 2013. However, the loanee failed to pay principal from the beginning and paid...
Indi Branch Canal (IBC) as source near Yaragal Village was commissioned (October 2002) to supply water at the rate of 113 lpcd for a period up to 2021. All the components 6 Muddebihal (2001, 2006, 2008), Sindagi (2002, 2010), Hukkeri (1999, 2006, 2013), Sankeshwar (1999, 2006, 2015) and...