MENU

Audit Reports

Reports older than 2009

Filter

filter

Page 80 of 168, showing 10 records out of 1,672 total

14 March 2016
Compliance Performance
Haryana
Report No 2 of 2016 - Public Sector Undertakings Government of Haryana

and were met satisfactorily;  Procu rement of inventories and transportation of fuel was done economically, efficiently and effectively;  Environment protection measures were undertaken effectively; and  Internal control system was commensurate with the size and activities of the......

Sector:
Power & Energy |
Industry and Commerce |
Agriculture and Rural Development
Download Full Report (PDF 14.57 MB)
30 March 2016
Compliance Performance
Telangana
Report No 5 of 2016 - Public Sector Undertakings Government of Telangana

agreements with fuel suppliers and guidelines of Central Electricity Authority (CEA)/ State Electricity Regulatory Commission (SERC) and Ministry of Environment and Forest (MoEF). iv. Interaction with Audited entity and analysis of the data with reference to audit criteria. 2.4 Audit Objectives......

Sector:
Finance

agreements with fuel suppliers and guidelines of Central Electricity Authority (CEA)/ State Electricity Regulatory Commission (SERC) and Ministry of Environment and Forest (MoEF). iv. Interaction with Audited entity and analysis of the data with reference to audit criteria. 2.4 Audit Objectives......

(PDF 0.1 MB)

5 of 2016 (Public Sector Undertakings) MCL Mahanadi Coalfields Limited MoEF Ministry of Environment and Forest MT Metric Ton MU Million Units MW Mega Watt NCDP New Coal Distribution Policy NIT Notice Inviting Tender PAF Plant Availability Factor PPP Public Private Partnership ROM Run of......

Download Full Report (PDF 2.04 MB)
30 March 2016
Compliance Performance
Telangana
Report No 4 of 2016 - General and Social Sector Government of Telangana

involves establishment of Adult Education Centres (AECs) otherwise known as Lok Shiksha Kendras at Gram Panchayat (GP) level to provide a learning environment so that learners (neo with their literary aspirations A total of 8,707 AECs (one in each GP) have been es tablished all over the State.......

Sector:
General Sector Ministries and Constitutional Bodies

Girls Home, Hyderabad, mentally challenged children were accommodated along with the other girls in a single dormitory, without providing an enabling environment. The Superintendents of child care institutions stated (May/July 2015) that segregation of juveniles or children based on their age,......

involves establishment of Adult Education Centres (AECs) otherwise known as Lok Shiksha Kendras at Gram Panchayat (GP) level to provide a learning environment so that learners (neo-literates and school dropouts) are encouraged to continue with their literary aspirations lifelong as well as to......

Download Full Report (PDF 4.85 MB)
30 March 2016
Compliance Performance
Telangana
Report No 2 of 2016 - Local Bodies Government of Telangana

The basic objective of the programme is to strive for holistic slum developmen t with a healthy and enabling urban environment. Out of 16 projects sanctioned (2 007-09) in the State for infrastructure development under IHSDP at a cost of ` `` `181.17 crore, nine 1 projects costing ` ``......

Sector:
General Sector Ministries and Constitutional Bodies

Objective of the Programme The basic objective of the programme is to strive for holistic slum development with a healthy and enabling urban environment. The admissible components under the programme include provision of: Shelter including up-gradation and construction of new houses......

(iii) Awareness among citizens Generating awareness among the public with regard to the procedures and creation of an enabling environment is the key to success of proper segregation and storage at source. In order to encourage the citizens, municipal authorities should organize awareness......

(PDF 0.04 MB)

The basic objective of the programme is to strive for holistic slum development with a healthy and enabling urban environment. Out of 16 projects sanctioned (2007-09) in the State for infrastructure development under IHSDP at a cost of ^181.17 crore, nine1 projects costing f113.53 crore were......

Creation of durable assets is also an important objective of the Act, with other auxiliary objectives including protection of environment, empowering rural women, reducing rural urban migration, fostering social equity, and strengthening rural governance through decentralization and processes of......

Download Full Report (PDF 0.75 MB)
30 March 2016
Compliance Performance
Andhra Pradesh
Report No 4 of 2016 - General and Social Sector Government of Andhra Pradesh

2012 -13; Phase -IV: 2013 -14; Phase -V: 2014 -15 Chapter II – Performance Audits Page 37 (AECs) at Gram Panchayat (GP) level to provide a learning environment , so that learners (neo literates and school dropouts) are encouraged to continue with their literary aspirations. The scheme intended......

Sector:
General Sector Ministries and Constitutional Bodies

2010-11; Phase-II: 2011-12; Phase-Ill: 2012-13; Phase-IV: 2013-14; Phase-V: 2014-15 (AECs) at Gram Panchayat (GP) level to provide a learning environment, so that learners (neo literates and school dropouts) are encouraged to continue with their literary aspirations. The scheme intended to......

Download Full Report (PDF 5.19 MB)
30 March 2016
Compliance Performance
Andhra Pradesh
Report No 1 of 2016 - Local Bodies Government of Andhra Pradesh

The basic objective of the programme is to strive for holistic slum developmen t with a healthy and enabling urban environment. Out of 27 projects sanctioned (2 007-09) in the State for infrastructure development under IHSDP at a cost of ` `` `241.30 crore, ten 1 projects costing ` ``......

Sector:
Finance |
Local Bodies

Objective of the Programme The basic objective of the programme is to strive for holistic slum development with a healthy and enabling urban environment. The admissible components under the programme include provision of: Shelter including up-gradation and construction of new houses......

(i) Awareness among citizens Generating awareness among the public with regard to the procedures and creation of an enabling environment is the key to success of proper segregation and storage at source. In order to encourage the citizens, municipal authorities should organise awareness......

(PDF 0.04 MB)

The basic objective of the programme is to strive for holistic slum development with a healthy and enabling urban environment. Out of 27 projects sanctioned (2007-09) in the State for infrastructure development under IHSDP at a cost of Z241.30 crore, ten1 projects costing ?110.43 crore were......

Creation of (MGNREGS) durable assets is also an important objective of the Act, with other auxiliary objectives including protection of environment, empowering rural women, reducing rural urban migration, fostering social equity, and strengthening rural governance through decentralization and......

Download Full Report (PDF 0.81 MB)
30 March 2016
Performance
Andhra Pradesh
Report No 5 of 2016 - Public Sector Undertakings Government of Andhra Pradesh

the Company’s activities helped in protection of environment . Audit criteria 2.4 The criteria adopted for achievement of audit objectives were: i. Memorandum and Articles of Association of the Company ; ii. Agenda notes and Minutes of Board meetings; iii. National Forest Policy 1988; and......

Sector:
Social Infrastructure |
General Sector Ministries and Constitutional Bodies

the Company’s activities helped in protection of environment. Audit criteria_ 2.4 The criteria adopted for achievement of audit objectives were: i. Memorandum and Articles of Association of the Company; ii. Agenda notes and Minutes of Board meetings; iii. National Forest Policy 1988; and......

Download Full Report (PDF 1.71 MB)
14 March 2016
Financial
Punjab
Report 2014_15 - State Finances Government of Punjab

-Energy 4815.78 2505.73 0.00 2505.73 -Industry and Minerals 57.81 63.03 0.00 63.03 -Transport 671.73 456.89 27.58 484.47 -Science, Technology and Environment 6.53 3.48 1.73 5.21 -General Economic Services 578.55 179.30 136.52 315.82 Grants-in-aid Contributions 529.66 604.03 0.00 604.03 Total......

Sector:
Finance
(PDF 0.75 MB)

2505.73 0.00 2505.73 -Industry and 57.81 63.03 0.00 63.03 Minerals -Transport 671.73 456.89 27.58 484.47 -Science, Technology 6.53 3.48 1.73 5.21 and Environment -General Economic 578.55 179.30 136.52 315.82 Services Grants-in-aid 529.66 604.03 0.00 604.03 Contributions Total 41640.67 41700.48......

Download Full Report (PDF 2.57 MB)
14 March 2016
Financial
Punjab
Report No 3 of 2015 - Revenue Sector Government of Punjab

Stamps and Registration Stamp Duty and Registration Fee 1,453 4,187 532.79 6. Director of Lotteries State Lotteries 19 48 152.02 7. Forest and Environment Forestry and wild life 280 421 372.99 Total 5,650 13, 194 3,609.73 Report No. 3 of the year 2015 (Revenue Sector) 8 Audit did not receive......

Sector:
Taxes and Duties
(PDF 0.66 MB)

Director of State Lotteries 19 48 152.02 Lotteries 7. Forest and Forestry and wild life 280 421 372.99 Environment Total 5,650 13,194 3,609.73 7 Report No. 3 of the year 2015 (Revenue Sector) Audit did not receive even the first replies from the Heads of offices within the stipulated time for......

Download Full Report (PDF 3.06 MB)
14 March 2016
Compliance Performance
Punjab
Report No 2 of 2015 - Social General and Economic Sectors PSUs Government of Punjab

Information & Communication Technology Corporation Limited 3.1 6 Non -implementation of project Decision to implement the project without waiting for environmental clearance and adequate financial arrangement resulted in infructuous expenditure of ` 2.32 crore and interest loss of ` 1.12 crore on......

Sector:
Transport & Infrastructure |
Power & Energy |
Industry and Commerce |
Agriculture and Rural Development

Information & Communication Technology Corporation Limited 3.16 Non-implementation of project Decision to implement the project without waiting for environmental clearance and adequate financial arrangement resulted in infructuous expenditure of 2.32 crore and interest loss of 1.12 crore on......

Download Full Report (PDF 2.36 MB)