Page 22 of 138, showing 10 records out of 1,377 total
Besides, stock \ \ \ 23 MTP–Medical Termination of Pregnancy. 24 As per Comprehensive Abortion Care (CAC) Training and Service Delivery Guidelines (2010 & 2018). 25 Injection Adrenaline, Injection Aminophyline, Inje ction Ampicillin 500 mg, Injection Atropine Sulphate, Injection Calcium..................
Resultantly, the OPD duty of the doctor concerned a nd the consultation time available to patients suffered. 4.7.1.2 Non-functioning of Trauma Centre Trauma Centre for strengthening and boosting the em ergency services at JH Chamoli was inaugurated by Hon’ble Chief Minister of Uttarakhan d (20..................
Chapter 2 Performance Audit Welfare of Scheduled Castes and Backward Classes, Technical Education, Higher Education, Skill Development and Industrial Training and Medical Education and Research Departments Post-Matric Scholarship Schemes for Scheduled Castes and Other Backward Class Students 2.1..................
2 PERFORMANCE AUDIT Welfare of Scheduled Castes and Backward Classes, T echnical Education, Higher Education, Skill Development and Industrial Training and Medical Education and Research Departments 2.1 Post-Matric Scholarship Schemes for Scheduled C astes and Other Backward Class Students..................
(Non-PSUs) for the year ended 31 March 2019 50 (vi) An area of 497.325 acre land was acquired (2004) by the State Government for setting up of Police Training and Research Cent re in Bhondsi village of Gurugram district. Out of this, 395.956 acre land w as covered under Sections 4 and 5 of Punjab..................
ering and Licensing Authority (RLA) are being exercised by Sub-Division al Officers (Civil) in respect of non-transport vehicles, while Secretarie s, Regional Transport Authorities (RTAs) are exercising the powers of RLA in respect of transport vehicles including goods vehicles. 5.2 Results of..................
21 BPLC03153D Canara Bank, Bairagadh 2.54 22 BPLC03241A Canara Bank 0.34 23 BPLI00379B Indian Overseas Bank 0.84 24 BPLI01220C Indian Overseas Bank Regional Office Bhopal 0.91 25 BPLI01307F Indian Overseas Bank 10.44 26 BPLP01424D Punjab National Bank, Shahpura 5.63 27 BPLP01500C Punjab National..................
under General Provident Funds (₹99.92 crore) and increase in disbursement of Deposits and Advances (₹151.23 crore) to Autonomous Districts and Regional Funds, Other Departmental Deposits and Forest Advances during the year. 1.18 Reserve Funds Reserve Funds are created for specific and well..................
Development Arunachal Pradesh State Council for Science & Techn ology, Itanagar 1031.89 Arunachal Pradesh State Health Society 50.40 North Eastern Regional Institute of Science & Technology (NERIST) 81.66 National Institute of Technology, Arunachal Pradesh 8.34 Rajiv Gandhi University 101.09 2..................
Post-purchase testing of medicines was being done in an ad-hoc manner at the Regional Drug Testing La boratory (RTDL), Guwahati and the Central Drug Testing Laboratory (CDTL) Kolkata, on the basis of samples drawn by the Assistant Drug Controller on a random basis, immedi ately on receipt of..................
National Hydrology Project PWD (Water Resource), Tr ipura 101.00 15. Incentivisation of Panchayat R.D (Panchayat) Depart ment 101.00 16. Training Scheme for PG & P State Institute of Public Administration and Rural Development, Tripura 95.18 17. Management Support to R.D. Programs and..................
1.3.3 Grants-in-Aid from Government of India Grants-in-Aid (GIA) from Centre to the State, a dis cretionary component of Central transfers, is considered to be an integral element of the Revenue Receipts of the State. The GoI released funds as grants under different sc hemes to the State for the..................
National Grid consists of five re gions viz., Northern, Eastern, Western, North Eastern and Southern, each having a Regional Load Dispatch Centre, an apex body to ensure integrated operation of the power system in the concerned region. Haryana State Load Dispatch Centr e (SLDC), under..................
road was approved (January 2013) by th e State Level Export Promotion Committee which released the funds under the head “Projects of national and regional importance” of t he scheme as State component. The reply is not acceptable as the proje ct for development of road infrastructure was not..................