MENU

Audit Reports

Reports older than 2009

Filter

filter

Page 55 of 168, showing 10 records out of 1,672 total

19 December 2017
Compliance
Report No.40 of 2017 - Compliance Audit of Department of Revenue – Direct Taxes Union Government

Taxes) 99 appeals have been addressed in the Appeals module of their ITBA and would be eliminated after the entire transition from manual to system environment stabilizes. 7.9.3.4 Non-Inspection o\b CIT (A)’s work by the Pr. CCIT CBDT Instr\bction No. 16 dated 04.11.2008 provides t hat an......

Sector:
Taxes and Duties

Taxes) 99 appeals have been addressed in the Appeals module of their ITBA and would be eliminated after the entire transition from manual to system environment stabilizes. 7.9.3.4 Non-Inspection of CIT (A)’s work by the Pr. CCIT CBDT Instruction No. 16 dated 04.11.2008 provides that an annual......

Download Full Report (PDF 1.39 MB)
19 December 2017
Compliance
Report No.41 of 2017 - Compliance Audit of Department of Revenue – Customs Union Government

Non levy of late cut on entitlement 20 DAP 71 Hyderabad 19.49 19.49 19.49 Commissioner of Customs (Preventive), Kakinada Irregular debiting of clean environment cess to MEIS and FPS schemes on import of coal 21 DAP 73 Chennai 80.00 80.00 80.00 Assistant Commissioner of Central Excise, Dindigul......

Sector:
Taxes and Duties
(PDF 0.28 MB)

Non levy of late cut on entitlement 20 DAP 71 Hyderabad 19.49 19.49 19.49 Commissioner of Customs (Preventive), Kakinada Irregular debiting of clean environment cess to MEIS and FPS schemes on import of coal 21 DAP 73 Chennai 80.00 80.00 80.00 Assistant Commissioner of Central Excise, Dindigul......

Download Full Report (PDF 2.09 MB)
19 December 2017
Performance
Report No.39 of 2017- Performance Audit of Rejuvenation of River Ganga(Namami Gange)

Government of India enacted the Environment (Protection) Act, 1986 for the protection and improvement of environment and connected matters. Environment incl udes water, air, land and the inter -relationships, which exists among and between water, air and land and human beings, other living......

Sector:
Environment and Sustainable Development

Government of India enacted the Environment (Protection) Act, 1986 for the protection and improvement of environment and connected matters. Environment includes water, air, land and the inter-relationships, which exists among and between water, air and land and human beings, other living......

v. NMCG was directed to install an STP, having capacity of 40 MLD, at Jagjeetpur within three months. vi. Uttarakhand Environment Protection and Pollution Control Board (UEPPCB) was directed to take action against 180 Industries, to whom Show Cause Notices were issued in the Year 2015-16 and......

102 Department of Expenditure; Ministries of Water Resources, River Development & Ganga Rejuvenation; Urban Development; Environment Forests & Climate Change; Drinking Water & Sanitation; Rural Development; Shipping; Tourism; Agriculture and Power 103 Bihar, Jharkhand, Uttarakhand, Uttar......

(PDF 0.75 MB)

Mission EA Executing Agency EAP Externally Aided Project ED Executive Director EFC Expenditure Finance Committee EIL Engineers India Limited EMP Environmental Management Programme EPIL Engineering Projects India Limited EPO Environmental Planning and Coordination Organisation ESC Empowered......

(PDF 0.41 MB)

Mission EA Executing Agency EAP Externally Aided Project ED Executive Director EFC Expenditure Finance Committee EIL Engineers India Limited EMP Environmental Management Programme EPIL Engineering Projects India Limited EPO Environmental Planning and Coordination Organisation ESC Empowered......

(PDF 0.78 MB)

24 On 20 February 2009, under Section 3(3) of the Environment (Protection) Act, 1986 3 Chapter Report No. 39 of 2017 Rejuvenation 22 of River Ganga (Namami Gange) NMCG replied (August 2017) AAPs would be prepared with SPMGs as tentatively NMCG has identified the projects and their deadlines.......

Bihar: There were overall 76 per cent vacancy as of June 2017. b. Jharkhand: Out of 271 sanctioned posts of Environment Engineer, Scientific Assistant, Lab Assistant, Sample Collector etc., 198 (73 per cent) posts were lying vacant as on March 2017. c. Uttarakhand: There was shortage of staff in......

Download Full Report (PDF 6.67 MB)
19 December 2017
Financial
Report No.44 of 2017 - Financial Audit of Accounts of the Union Government

(9.13) 68854 (29.54) 92446 (34.26) Industries and Minerals 2305 (-11.31) 3230 (40.13) 4013 (24.26) 3634 (-9.44) 4140 (13.92) Science, Technology and Environment 2438 (12.86) 3080 (26.33) 3188 (3.53) 4040 (26.73) 5230 (29.46) Energy 1083 (-60.79) 733 (-32.36) 945 (28.92) 2105 (122.75) 4673......

Sector:
Finance
(PDF 1.1 MB)

Department of Elementary Education & Literacy 1 1132 26. Department of Personnel and Training 1 1511 27. Ministry of Environment and Forest 2 -849 28. MoEF, West Bengal 1 3973 29. Ministry of Finance 3 13662 30. Ministry of Rural Development 1 79249 31. Ministry of Tourism 1 54474 32. Ministry......

& Name of the Ministry/ Department Amount (` `` ` in crore) Head of Account Observation Reply of the Ministry/ Department 27-Ministry of Environment, & Forest & Climate Change 2.99 3435.03.102.05.02.11 3435.03.102.05.02.13 3435.03.102.05.02.28 The Ministry allocated an amount of ` 2.99 crore......

(PDF 1.7 MB)

(9.13) 68854 (29.54) 92446 (34.26) Industries and Minerals 2305 (-11.31) 3230 (40.13) 4013 (24.26) 3634 (-9.44) 4140 (13.92) Science, Technology and Environment 2438 (12.86) 3080 (26.33) 3188 (3.53) 4040 (26.73) 5230 (29.46) Energy 1083 (-60.79) 733 (-32.36) 945 (28.92) 2105 (122.75) 4673......

Download Full Report (PDF 3.49 MB)
19 December 2017
Performance
Report No.36 of 2017 - Performance Audit on Induction of bio-toilets in passenger coaches in Indian Railways Union Government

As a result, there is organic pollution and u n-hygienic environment at Stations causing inconvenience to passengers and difficulty in proper maintenance of tracks. In November 2009, Railway Board set up a Core Group to decid e suitable environment friendly toilets for use in IR by carrying......

Sector:
Transport & Infrastructure
(PDF 0.52 MB)

As a result, there is organic pollution and un-hygienic environment at Stations causing inconvenience to passengers and difficulty in proper maintenance of tracks. IR started efforts in 1993 with limited trials with biological toilet system imported by Integral Coach Factory (ICF) from the United......

(PDF 0.3 MB)

As a result, there is organic pollution and u n-hygienic environment at Stations causing inconvenience to passengers and difficulty in proper maintenance of tracks. In November 2009, Railway Board set up a Core Group to decid e suitable environment friendly toilets for use in IR by carrying......

Download Full Report (PDF 4.47 MB)
30 November 2017
Performance
Madhya Pradesh
Report of the Comptroller & Auditor General of India for the year ended 31 March 2016 on "Performance Audit on Implementation of the Right of Children to Free and Compulsory Education Act, 2009 Government of Madhya Pradesh-Report No.5 of 2017"

the appropriate Government and the loca l authority should ensure that every child with a disability has access to fr ee education in an appropriate environment and endeavour to provide integration of students with disabilities in the normal schools. The purpose of operating hostels for migratory......

Sector:
Education, Health & Family Welfare

Quality of education is contingent upon many factor s, like quality of teachers, teaching techniques and aids, syllabus and evaluati on process, environment for learning etc. In Madhya Pradesh, there were 1.14 la kh Government Schools at Primary and Upper Primary level as on March 2016. L......

the appropriate Government and the loca l authority should ensure that every child with a disability has access to fr ee education in an appropriate environment and endeavour to provide integration of students with disabilities in the normal schools. The purpose of operating hostels for migratory......

Download Full Report (PDF 3.37 MB)
24 October 2017
Compliance
Rajasthan
Report No.3 of 2017 - Local Bodies Government of Rajasthan

Finance Commission, Bhamashah scheme, utilisation of untied funds, backward region grant fund, medical facilities, other social welfare schemes, environmental issues, issues concerning children’s education, maintenance of law and order, submission of utilisation certificates etc. Audit......

Sector:
Local Bodies

ULBs is Chart 3.1 ELECTED MEMBERS LEVEL EXECUTIVE LEVEL unctioning of ULBs 45 to 47 and 101 to 103 of RMA, 2009 have c unctions for protection of environment, public health, sanitation, conservation, solid waste manageme ng pu blic streets, places and sewers and all spaces, lig ildings ,......

4.1.2.17 Irregular Retention of Share of Passenger Tax Government of Rajasthan constituted (10 January 2002) Mount Abu Environment Committee for development works in forest area and wildlif e in Mount Abu. For this a provision of 30 per cent of total revenue collected from passenger tax to be......

Roads and bridges 10. Public health and solid waste management 11. Fire services 12. Urban forestry, protection of the environment and promotion of ecological aspect 13. Provision of urban amenities and facilities such as parks, gardens, play grounds etc. 14. Safeguarding the interests of......

Download Full Report (PDF 2.66 MB)
16 September 2017
Compliance Performance
Odisha
Report No.1 of 2017 - General and Social Sector Government of Odisha

crore  could  not  be  derived  due  to  delay  in  execution  of  the  projects  in  Cuttack  and  B hubaneswar  cities.  Environmental  impact  due  to  non-completion  of  these   projects  was  observed  in  some  of  the  upstream  and  downstream ......

Sector:
General Sector Ministries and Constitutional Bodies

Thus, due to insufficient provision of funds couple d with non-distribution of available work books, the objective of creating joy ful learning environment with pre-reading/ writing skills of children remained largely unfulfilled. The Department stated (October 2016) that work book s could not be......

Effective in fection prevention and control is essential for providing high quality health care to the patients and a safe working environment for those working in healthcare establishments. Hospitals were required to minimise the risk of spr eading infection to patients and staff in hospitals......

Protocol LWE Left Wing Extremism MGNREGS Mahatma Gandhi National Rural Employment Gu arantee Scheme MHA Ministry of Home Affairs MoEF Ministry of Environment and Forest MoUD Ministry of Urban Development MSRR Minimum Standard Requirements for Medical Coll eges Regulations NBC National Building......

Download Full Report (PDF 6.79 MB)
12 August 2017
Financial
Jharkhand
Report No. 5 of 2016 - State Finances, Government of Jharkhand for the year ended 31 march 2016

good,  e.g.  enforcement  of  law  and  order,  security  and  protection  of  our  rights;  p ollution  free  air  and  other  environmental  goods  and   road  infrastructure etc.    7 The  analysis  of  expenditure  data  is  disaggregated  i nto ......

Sector:
Finance

2343.92 Energy 1602.48 601.96 2204.44 237.22 Industry and Minerals 49.5 271.98 321.48 835.77 Transport 244.12 103.85 347.97 0 Science, Technology and Environment 0 0 0 917.78 General Economic Services 82.54 782.22 864.76 0 Grants-in-aid and Contributions 0 0 0 31794.90 Total 20759.81 15793.02......

Download Full Report (PDF 2.74 MB)
16 September 2017
Financial
Odisha
Report No.6 of 2016 - State Finances Government of Odisha

3181.26 2038.41 4 5-Finance 9844.34 0 9844.34 6610.41 3233.93 5 16 -Planning and Co -ordination 1178.19 03 1178.1 9 610.90 567.2 9 6 22 -Forest and Environment 717.15 68.56 785.71 578.43 207.28 Capital (Voted) 7 1-Home 442.48 77.00 519.48 318.58 200.9 0 8 30 -Energy 1156.87 798.82 1955.69......

Sector:
Finance

-Energy - - 52.76 -- -- -- 374.73 -Industry and Minerals - - 485.80 -- -- -- 1895.54 -Transport - - 1845.50 -- -- -- 54.09 -Science, Technology and Environment - - 46.12 -- -- -- 1019.94 General Economic Services - - 742.39 -- -- -- 817. 37 Grants -in-aid and Contributions - - - 915.25 -- II.......

3181.26 2038.41 4 5-Finance 9844.34 0 9844.34 6610.41 3233.93 5 16 -Planning and Co -ordination 1178.19 03 1178.1 9 610.90 567.2 9 6 22 -Forest and Environment 717.15 68.56 785.71 578.43 207.28 Capital (Voted) 7 1-Home 442.48 77.00 519.48 318.58 200.9 0 8 30 -Energy 1156.87 798.82 1955.69......

Download Full Report (PDF 5.52 MB)