Page 55 of 168, showing 10 records out of 1,672 total
Taxes) 99 appeals have been addressed in the Appeals module of their ITBA and would be eliminated after the entire transition from manual to system environment stabilizes. 7.9.3.4 Non-Inspection o\b CIT (A)’s work by the Pr. CCIT CBDT Instr\bction No. 16 dated 04.11.2008 provides t hat an......
Taxes) 99 appeals have been addressed in the Appeals module of their ITBA and would be eliminated after the entire transition from manual to system environment stabilizes. 7.9.3.4 Non-Inspection of CIT (A)’s work by the Pr. CCIT CBDT Instruction No. 16 dated 04.11.2008 provides that an annual......
Non levy of late cut on entitlement 20 DAP 71 Hyderabad 19.49 19.49 19.49 Commissioner of Customs (Preventive), Kakinada Irregular debiting of clean environment cess to MEIS and FPS schemes on import of coal 21 DAP 73 Chennai 80.00 80.00 80.00 Assistant Commissioner of Central Excise, Dindigul......
Government of India enacted the Environment (Protection) Act, 1986 for the protection and improvement of environment and connected matters. Environment incl udes water, air, land and the inter -relationships, which exists among and between water, air and land and human beings, other living......
Government of India enacted the Environment (Protection) Act, 1986 for the protection and improvement of environment and connected matters. Environment includes water, air, land and the inter-relationships, which exists among and between water, air and land and human beings, other living......
v. NMCG was directed to install an STP, having capacity of 40 MLD, at Jagjeetpur within three months. vi. Uttarakhand Environment Protection and Pollution Control Board (UEPPCB) was directed to take action against 180 Industries, to whom Show Cause Notices were issued in the Year 2015-16 and......
102 Department of Expenditure; Ministries of Water Resources, River Development & Ganga Rejuvenation; Urban Development; Environment Forests & Climate Change; Drinking Water & Sanitation; Rural Development; Shipping; Tourism; Agriculture and Power 103 Bihar, Jharkhand, Uttarakhand, Uttar......
Mission EA Executing Agency EAP Externally Aided Project ED Executive Director EFC Expenditure Finance Committee EIL Engineers India Limited EMP Environmental Management Programme EPIL Engineering Projects India Limited EPO Environmental Planning and Coordination Organisation ESC Empowered......
24 On 20 February 2009, under Section 3(3) of the Environment (Protection) Act, 1986 3 Chapter Report No. 39 of 2017 Rejuvenation 22 of River Ganga (Namami Gange) NMCG replied (August 2017) AAPs would be prepared with SPMGs as tentatively NMCG has identified the projects and their deadlines.......
Bihar: There were overall 76 per cent vacancy as of June 2017. b. Jharkhand: Out of 271 sanctioned posts of Environment Engineer, Scientific Assistant, Lab Assistant, Sample Collector etc., 198 (73 per cent) posts were lying vacant as on March 2017. c. Uttarakhand: There was shortage of staff in......
(9.13) 68854 (29.54) 92446 (34.26) Industries and Minerals 2305 (-11.31) 3230 (40.13) 4013 (24.26) 3634 (-9.44) 4140 (13.92) Science, Technology and Environment 2438 (12.86) 3080 (26.33) 3188 (3.53) 4040 (26.73) 5230 (29.46) Energy 1083 (-60.79) 733 (-32.36) 945 (28.92) 2105 (122.75) 4673......
Department of Elementary Education & Literacy 1 1132 26. Department of Personnel and Training 1 1511 27. Ministry of Environment and Forest 2 -849 28. MoEF, West Bengal 1 3973 29. Ministry of Finance 3 13662 30. Ministry of Rural Development 1 79249 31. Ministry of Tourism 1 54474 32. Ministry......
& Name of the Ministry/ Department Amount (` `` ` in crore) Head of Account Observation Reply of the Ministry/ Department 27-Ministry of Environment, & Forest & Climate Change 2.99 3435.03.102.05.02.11 3435.03.102.05.02.13 3435.03.102.05.02.28 The Ministry allocated an amount of ` 2.99 crore......
As a result, there is organic pollution and u n-hygienic environment at Stations causing inconvenience to passengers and difficulty in proper maintenance of tracks. In November 2009, Railway Board set up a Core Group to decid e suitable environment friendly toilets for use in IR by carrying......
As a result, there is organic pollution and un-hygienic environment at Stations causing inconvenience to passengers and difficulty in proper maintenance of tracks. IR started efforts in 1993 with limited trials with biological toilet system imported by Integral Coach Factory (ICF) from the United......
the appropriate Government and the loca l authority should ensure that every child with a disability has access to fr ee education in an appropriate environment and endeavour to provide integration of students with disabilities in the normal schools. The purpose of operating hostels for migratory......
Quality of education is contingent upon many factor s, like quality of teachers, teaching techniques and aids, syllabus and evaluati on process, environment for learning etc. In Madhya Pradesh, there were 1.14 la kh Government Schools at Primary and Upper Primary level as on March 2016. L......
Finance Commission, Bhamashah scheme, utilisation of untied funds, backward region grant fund, medical facilities, other social welfare schemes, environmental issues, issues concerning children’s education, maintenance of law and order, submission of utilisation certificates etc. Audit......
ULBs is Chart 3.1 ELECTED MEMBERS LEVEL EXECUTIVE LEVEL unctioning of ULBs 45 to 47 and 101 to 103 of RMA, 2009 have c unctions for protection of environment, public health, sanitation, conservation, solid waste manageme ng pu blic streets, places and sewers and all spaces, lig ildings ,......
4.1.2.17 Irregular Retention of Share of Passenger Tax Government of Rajasthan constituted (10 January 2002) Mount Abu Environment Committee for development works in forest area and wildlif e in Mount Abu. For this a provision of 30 per cent of total revenue collected from passenger tax to be......
Roads and bridges 10. Public health and solid waste management 11. Fire services 12. Urban forestry, protection of the environment and promotion of ecological aspect 13. Provision of urban amenities and facilities such as parks, gardens, play grounds etc. 14. Safeguarding the interests of......
crore could not be derived due to delay in execution of the projects in Cuttack and B hubaneswar cities. Environmental impact due to non-completion of these projects was observed in some of the upstream and downstream ......
Thus, due to insufficient provision of funds couple d with non-distribution of available work books, the objective of creating joy ful learning environment with pre-reading/ writing skills of children remained largely unfulfilled. The Department stated (October 2016) that work book s could not be......
Effective in fection prevention and control is essential for providing high quality health care to the patients and a safe working environment for those working in healthcare establishments. Hospitals were required to minimise the risk of spr eading infection to patients and staff in hospitals......
Protocol LWE Left Wing Extremism MGNREGS Mahatma Gandhi National Rural Employment Gu arantee Scheme MHA Ministry of Home Affairs MoEF Ministry of Environment and Forest MoUD Ministry of Urban Development MSRR Minimum Standard Requirements for Medical Coll eges Regulations NBC National Building......
good, e.g. enforcement of law and order, security and protection of our rights; p ollution free air and other environmental goods and road infrastructure etc. 7 The analysis of expenditure data is disaggregated i nto ......
2343.92 Energy 1602.48 601.96 2204.44 237.22 Industry and Minerals 49.5 271.98 321.48 835.77 Transport 244.12 103.85 347.97 0 Science, Technology and Environment 0 0 0 917.78 General Economic Services 82.54 782.22 864.76 0 Grants-in-aid and Contributions 0 0 0 31794.90 Total 20759.81 15793.02......
3181.26 2038.41 4 5-Finance 9844.34 0 9844.34 6610.41 3233.93 5 16 -Planning and Co -ordination 1178.19 03 1178.1 9 610.90 567.2 9 6 22 -Forest and Environment 717.15 68.56 785.71 578.43 207.28 Capital (Voted) 7 1-Home 442.48 77.00 519.48 318.58 200.9 0 8 30 -Energy 1156.87 798.82 1955.69......
-Energy - - 52.76 -- -- -- 374.73 -Industry and Minerals - - 485.80 -- -- -- 1895.54 -Transport - - 1845.50 -- -- -- 54.09 -Science, Technology and Environment - - 46.12 -- -- -- 1019.94 General Economic Services - - 742.39 -- -- -- 817. 37 Grants -in-aid and Contributions - - - 915.25 -- II.......