08 December 2015
Performance
Report No. 28 of 2015 - Performance Audit on Sanitation Campaign /Nirmal Bharat Abhiyan for the year ended March 2014 Union Government, Ministry of Drinking Water and Sanitation

Further, scheme funds amounting to ` 283.12 crore were diverted and utilised for the purposes such as advance to staff, creation of capital assets, Leave Salary Pension Contribution, purchase of vehicles and office sanitation in 13 States. Further, in six States an amount of ` 81.08 crore...............

(PDF 1.06 MB)

28 of 2015 Annex- 4.6 Diversion of funds (Refer to paragraph 4.7) No State Year Amount (\' in lakh) Purpose 1. Bihar 2011-12 955.70 Advance to staff 2. Chhattisgarh 2009-10 259.21 Advance to staff 2010-11 75.48 Advance to staff 2011-12 358.71 Advance to staff 2012-13 37.38 Advance to staff 3................

Download Full Report (PDF 5.04 MB)
08 December 2015
Compliance
Report No. 30 of 2015 - Compliance Audit on Union Government, Scientific and Environmental Departments

The current report includes two long paragrap hs on grant of incentives to staff by DAE (Para 2.1 of the Report) and DOS (Para 5.1 of the Report) as well as paragraph on irregular grant of promotions (P ara 4.2 of the Report) by CSIR. 1.5.4 Deficient internal controls Internal controls are...............

Download Full Report (PDF 9.43 MB)
18 December 2015
Performance
Report No. 48 of 2015 - Performance Audit on Status of Ongoing Projects Union Government, Railways

  82TAC consists of variable components consisting of – Traction Power, staff and Materials – and fixed components consisting of staff, material, depreciation and cost of debt. The fixed component would be payable...............

(PDF 1.17 MB)

percent expendit d ( in sanction of project ure till crore) March 2014 ( in crore) Ph-I Eklakhi-Balurghat 1.4.83 1983-84 Not fixed Completed and commissioned on 30.12.04 Ph-II Raiganj-Itahar 1.4.11 2011-12 31.3.14 Not fixed Ph-III Itahar-Buniyadpur 1.4.12 2012-13 31.3.15 Not fixed Ph-IV...............

(PDF 0.73 MB)

one project Projects maximum milestones revised cost revised dropped for detailed projects or other agencies (other categories selected time estimate commissioning review than PPP projects) (repetition overrun schedule counted and cost once) overrun ECoR 1) Nil 1) Khurda Nil Nil Nil 1) Talcher-...............

Download Full Report (PDF 2.67 MB)
21 December 2015
Performance
Report No. 41 of 2015 - Performance Audit on Capacity Utilisation, Electricity Generation, Sale and Collection of Revenue including Disaster Management by Hydro Power CPSEs, Union Government, Ministry of Power

41 of 2015 (v) DMP of DGPS provided that in the situation of flooding of power house, maintenance staff should be informed by operation in-charge for lowering of DT gate 26 and as soon as the gate is lowered, the DT drain valve should be opened. However, from the sequence of events recorded in...............

(PDF 0.09 MB)

during inspection of 2009. gauge, wind velocity recorder etc.) are installed on dam site. / 62 f- Report No. 41 of 2015 6 The staff should be properly trained Same observation as noticed to monitor & operate the entire during inspection of 2012. instrumentation of dam to ascertain the actual...............

Download Full Report (PDF 3.44 MB)
18 December 2015
Compliance
Report No. 44 of 2015 - Compliance Audit on Army Ordnance Factories and Defence Public Sector Undertakings Union Government Defence Services

5.3) Project Management in Terminal Ballistics Research Laboratory Chandigarh Out of 28 projects selected for audit, 24 projects including two staff and 22 R&D projects were completed by TBRL . We however observed that against the two staff projects, parameters as per qualitative...............

Sector:
Defence and National Security
Download Full Report (PDF 3.24 MB)
18 December 2015
Performance
Report No. 36 of 2015 - Performance Audit on Mid Day Meal Union Government, Ministry of Human Resource Development

funds by the M H R D is g iv e n in Table 5.3 below : Central  level (i)External Monitoring & Evaluation (ii) Management & Internal Monitoring (a) Staff salaries (b) Transport and Contingencies expenses (c) Furniture, Computer hardware and consumables (d) Advertisement and publicity (d) Other...............

Download Full Report (PDF 9.55 MB)
18 December 2015
Performance
Report No. 35 of 2015 - Performance Audit on Construction activities in Central Armed Police Forces Union Government, Ministry of Home Affairs

0 2 2 59.01 0 0 0 0.63 527 BSF Delhi Construction of office accommodation for BSF staff air wing, New Delhi Deptt. 0 1 1 58.91 0 0 0 0.64 528 BSF Delhi Providing flooring tiles in corridors in BSF HQ, New Delhi Deptt. 0 2 4 50.73 0 0 0 0.55 529 BSF Delhi Renovation of Type-I quarters at BSF...............

Download Full Report (PDF 4.45 MB)
22 December 2015
Financial
Report No. 50 of 2015 - Financial Audit on Account of Union Government

MCI reiterated its last year’s reply (October 2015) that it had initiated procedure for purchase of land for staff residentia l quarters and convention hall and ` 300 crore was expected to be utilised. Furthermore, Central Council of Homeopathy (Council ) stated (October 2015) that the...............

Sector:
Finance
(PDF 0.71 MB)

3201.02.102.01-Mail Sorting s 11.93 1105.31 19.75 R (-1168.34 37. 3201.04.101.01-Cost of Pay & O 80.00 94.14 14.14 Allowances of Audit Staff 38. 3201.05.053.01-Building o 77.77 89.51 8.88 R (+12.86 39. 3201.07.104.01-Gratuties O 681.60 648.79 26.69 R (-159.50 40. 5201.00.104.14-Setting up of...............

Download Full Report (PDF 3.53 MB)
18 December 2015
Compliance
Report No. 38 of 2015 - Compliance Audit on Air Force, Union Government, Defence Services

deployment for medical relief in disaster area coul d not be utilized, as critical medical equipment were deleted and housing package including staff accommodation, flooring, hospital furniture, etc., we re added to initial scope, which made it heavie r. Resultantly user Rapid Action Medical...............

Download Full Report (PDF 3.24 MB)
08 December 2015
Performance
Report No. 29 of 2015 - Performance Audit on Union Government, Railways

The CSP (2003-13) observed that the main tenance staff also needed to be trained like running staff (TTE, coach a ttendant, catering staff etc.). Audit noticed that sizable percentage of employees have not attended training Fire Accidents in Passenger Coaches in Indian Railways    ...............

Download Full Report (PDF 1.06 MB)