Page 49 of 59, showing 10 records out of 582 total
Report of the Comptroller and Auditor General of India on State Finances for the year ended 31 March 2013 GOVERNMENT OF MIZORAM Audit Report (State Finances ) for the year ended 31 March 2013 i............
This Report contains 19 audit paragraphs (including three general paragraphs) pertaining to Civil, Revenue and Commercial portion and one performance review. There is a separate chapter on Integrated Audit of the Agriculture Department. According to ...
The South Division deposits the funds withdrawn from the Treasury in a current account opened by them for the purpose with State Bank of India, Main branch, Kohima and transfers the funds to other divisions through cheque. A scrutiny of relevant records in the South Division by Audit (March 2010)............
The previous review on AIBP featured in the CAG’s Audit Report for the year ended 31 March 2003 had recommended that the Government should ensure availability of required land and forest clearance for timely completion of the projects. The present performance audit indicates that the............
However in three Indian Standards selected units12, eight works of construction of lined field channels with width 1.35 metre, both RRHG stone masonry with cement mortar(l:4) in walls and 450mm thick cement concrete (1:3:6) in bed were provided instead of 75 mm thick cement concrete(l:3:6)............
Report of the Comptroller and Auditor General of India On State Finances for the year ended 31 March 2013 http://www.cag.gov.in Government of Maharashtra Table of Contents Audit Report (State............
Urban (All India = 0.38) 0.38 9 Gross State Domestic Product (GSDP) 2012-13 at current price 1372644 crore Per capita GSDP CAGR (2003-04 to 2012-13) Maharashtra 14.83 per cent 10 General Category States 14.94 per cent GSDP CAGR (2003-04 to 2012-13) Maharashtra 16.73 per cent 11 General Category............
This Report contains four Performance Audits on Sarva Shiksha Abhiyan, Working of Industries Department, Implementation of National Rural Drinking Water Programme and Working of Municipal Corporation, Shimla and 23 paragraphs involving Rs. 2049.77...
taken up for execution between February 2011 and November 2012 was lying incomplete even after incurring an expenditure ^ 0.36 crore._ Government of India (GOI) in Ministry of Environment and Forests revised (August 2009) the Integrated Forest Protection Scheme and renamed it as Intensification............
This Report has been prepared in six chapters. Chapters I to V deal with Social, Economic, Public Sector Undertakings, Revenue and General Sectors, and Chapter VI deals with Follow up of Audit observations. The Report contains three performance...
Non Lapsable Central Pool of Resources and North Eastern Council The Non Lapsable Central Pool of Resources (NLCPR) was created by the Government of India (Gol) in 1998-99 to ensure speedy development of infrastructure in the eight States of the North-Eastern Region (NER)1. Projects of............
commercial undertakings 125 1.8Implicit subsidies with respect to regional rural banks and statutory corporations/Government Companies discussed in CAG’s Report No.1 for the year 2011-12 126 1.9Detailed loan accounts maintained by Pr. Accountant General’s Office 127 2.1Major heads of account............
This Report has been prepared in six chapters. Chapters I to V deal with Social, Economic, Public Sector Undertakings, Revenue and General Sectors, and Chapter VI deals with Follow up of Audit observations. The Report contains two performance...
Important audit findings are processed for inclusion in the Audit Report of C&AG of India. The audits were conducted during 2011-12 involving expenditure off 835.74 crore (including funds pertaining to previous years audited during the year) of the State Government under Social Sector. This............
This Report contains Civil and Commercial chapters comprising five performance reviews (including one on integrated audit of a Government department) and 25 audit paragraphs, based on the audit of certain selected programmes and activities and the...
Meanwhile, the Government of India launched the Accelerated Irrigation Benefits Programme (AIBP) in 1996-97 to provide central loan assistance to States to expedite completion of major and medium surface irrigation projects. During 1999-2000, surface minor irrigation schemes (both new and............
Report of the Comptroller and Auditor General of India ON GENERAL AND SOCIAL (NON-PSUs) SECTORS for the year ended 31 March 2013 Government of Madhya Pradesh Report No.3 of the year 2014 i TABLE OF............
The Accelerated Rural Water Supply Programme (ARWSP) was renamed (2009) as National Rural Drinking Water Programme (NRDWP) by the Government of India (Gol) to provide every rural person with adequate safe water for drinking, cooking and other domestic basic needs on a sustainable basis. The............