Page 3 of 62, showing 10 records out of 614 total
cause to be laid before the State Legislature, a statemen t of the estimated receipts and expenditure of the State for the year 2020-21, in t he form of an Annual Financial Statement . In terms of Article 203, the statement is submitt ed to the State Legislature in the form of Demands for............
Government may consider strengthening of finan cial monitoring to avoid rush of expenditure at fag end of the year. iv. Government may consider formulating strategies for actual execution of major policy decisions and development schemes in t he State at the time of preparing budgetary............
sales 2.3 19-20 Inadmissible/Excess Input Tax Credit 2.4 20-21 Non levy of penalty 2.5 22 Underassessment due to allowing exemptions against ‘F’ forms and ‘C’forms 2.6 23-25 Excess benefit of Input Tax Credit due to non-rever sal 2.7 25-26 Under assessment of tax due to application of............
The achievement of the objective s of the Department was ensured through internal controls in the form of in structions and Internal Audit. Besides, enforcement mechanism through the Departme nt, Police formations also supplemented the other enforcement controls in achievement of the............
There is an absence of adequate checks and validations to matc h the registrations/a\b\brovals data \brovided in the ITR Form-7 with the ITD systems database before allowing exem\btions in case the returns were \brocessed in summary manner. In 42 assessment cases, exem\btion was allowed............
A udit noted certain loopholes remaining in the Act/Rules/Circulars in the form of ambiguity or lack of clarity in the provisions which may be misused causing loss of revenue. Audit has identified certain systemic issues/ambiguity in the Act /inconsistency in allowing exemption in 65 cases 29 as............
based on GIS system for creating and maintaining asset database beside physical survey in villages and other areas which will enable it to formulate schemes and complete the work within stipulated time. Village and Household electrification Though the targets to complete............
Based on the broad scope of work validated by REC, JBVNL was to formul ate district/circle/zone-wise DPRs based on detailed fi eld survey and latest schedule of rates. Audit did not find details on record based on which NAD was prepared to ascertain that there was sufficient relevant inform............
of Rural Electrification Schemes in Jharkhand for the year ended 31 Mar ch 2020 [64] Bid from those bidders who had failed to submit per formance security on issue of LoI/LoA for any other contract of the Empl oyer in the past three years was not acceptable. Audit noticed that NITs............
Chapter 5 S trengthening of S ub-transmission and D istribution network 5.1 Non achievement of target of PSSs construction The development of sub-transmission and distributio n (ST&D) infrastructure 81 in rural areas aimed to provide uninterrupted...
stock register 2.1.8 105 2.1.5 List of equipment not found in joint physical verification 2.1.8 112 2.1.6 List of sets of equipment not found in the form of sets during physical verification 2.1.8 113 APPENDICES (SECTION C) Appendix no. Description Reference to Paragraph Page 1.1.1 Summarised............
Framework of Power Sector SPSEs Power is a core component to operate industrial activities to boost the economy of any State. The State Government formulated (06 January 2014) the Jharkhand State Electricity Reforms Transfer Scheme, 2013 (JSERTS 2013) for unbundling of Jharkhand State Electricity............
In Andhra Pradesh, DLCs were not established in all the nine coastal districts as on March 2021. In Goa, DLCs were formed in 2017 after delay of six years of \bromulgation of the CRZ notification. DLCs are yet to be reconstituted in two coastal districts of Karnataka as on March 2021. (Para............
Motimahal Hotels Pvt. Ltd., Karnataka 2017 The Environment Management Plan and the DMP which formed a part of the EIA was proposed by the PP itself and an accredited consultant was not appointed. 3. Expansion of port facilities by Redi Port Ltd in Maharashtra 2018 The consultant engaged was not............
15 of 2022 vi Department of Telecommunications (DoT) DoT is responsible for policy formulation, performance review, monitoring, international cooperation and Research & Development in telecommunication sector. The Department is also responsible for frequency allocations, radio............
5.13 44 Chapter-6: Management of E-Waste Absence of consolidated instructions and training for handling of E-Waste 6.1 45 Submission of stipulated Form 3 to SPCB 6.2 45 Storage of the E-Waste beyond permissible limit 6.3 46 Conclusion 6.4 46 Recommendation 6.5 47 Annexures - 1.1 to 6.2 49 - 110............
annually to the concerned SPCB as indicat ed in Table 3.2 below: - Table 3.2 - Environmental statements required to be furnished annually to SPCB Form Extant Provision/Rule Disclosure to be made about Scheduled date of filing Form 4 Hazardous Waste Management Rules, 2016 Quantity of waste............
16 of 2022 Railways to formulate proposals, wherever considere d economically desirable for setting up ETPs considering the economic, social an d environment consideration. The National Green Tribunal (NGT), in its order dated 1 8 March 2015 asked railway authorities to ensure that effluents............
in Form-II prescribed under the Rules. Every occu pier is mandatorily required to take all necessary steps to ensure that bio-medical waste is handled in accordance with BMW Rules and without any adverse effect to human h ealth and the environment. It was observed that the required............
Good Practices in CGHS 6 1.12 Acknowledgement 6 Chapter-II Procurement and Supply of drugs 7 2.1 System of Procurement of drugs for CGHS 7 2.2 Drug formulary and Finalisation of Procurement Rates of drugs 9 2.2.1 Drug formulary 9 2.2.2 Delay in revision of drug formulary 9 2.2.3 Non-finalisation............
of various offices involved in process of procurement of Drugs for CGHS is given b elow: Ministry of Health & Family Welfare ● Approves the Drug Formulary prepared by Medical Stores Organisation (MSO) ● Approves Rate contract of drugs processed by MSO ● Approves provisioning of drugs for............
Policy and Regulations Chapter 3: Policy and Regulations 3.1 Formulation and updation of Acts, Rules and Laws 10 3.2 Preparation of Heritage Bye -Laws and Site -Plans 13 B. Human Resources Management Chapter 4: Governance and Infrastructure 4.1 Organisation and Governance in ASI 17 4.2............