of the IR.s issued to Energy Department relating to Electricity Taxes during the last 10 years, paragraphs included in these reports and their status as on 31 March 2019 are tabulated in Table No. 1.9. Table No. 1.9: Position of Inspection Reports (l' in crore) Opening balance Additions.........
Establishment of a separate transformer was sanctioned (July 2019) fort 3.15 crore and tender specification was finalised (May 2020). The other two units are idle for want of adequate power supply since August 2018. Thus, TNAU failed to ascertain the requirement of adequate power supply to.........
Corporation(B - i) schemes and non finalisation of work 12 4711 - 03 - 103 - 2725 - Medium Irrigation Proj ect under State Plan 10 100 Delay in tender process, non implementation of new scheme and lockdown for COVID - 19 13 4711 - 03 - 789 - 2725 - Medium Irrigation Project under State Plan.........
(Paragraph 2.1.3.2) Overview -ix- The tender and agreement documents were loaded in f avour of contractors such as reduction in defect liability period of bridges etc. (Paragraph 2.1.3.3) No responsibility was fixed for execution of sub-st andard works valued at ` 52.07 crore in six bridges..........
During physical verification, Audit observed that t he location of the TCs was remote and sparsely populated. Despite tendering both the assets remained non-oper ational and the expenditure of ` 2.96 crore on these TCs has become unfruitful. Department (July 2020)/JTDC replied (June.........
of consultants On the directions of the CE, the EE, Rural Developm ent Special Division (RDSD), Ranchi invited (May 2015) a short notice e- tender 3 for empanelment of consultants for preparation of DPRs of MMGSY bri dges. In response, 11 firms participated in the tender for empanelment.........
In response, 11 firms participated in the tender for empanelment of which 10 firms were technically qualified. During financial evaluation (June 2015) one consultant 4 w ho quoted the rate of one per cent of estimated cost of civil work of bridge plus service tax was declared the lowest.........
Audit observed that though JTDC invited tenders for outsourcing TC Maluti (March 2016) and TC Baridih (March 2016 and Decembe r 2016), these assets could not be outsourced to successful bidders for r easons not available on record. During joint physical verification (March 2 020), Audit noticed.........
levy of one-time tax on personalised vehicles 208 The results of analysis were verified with the real time data/manual records related to change in status of tax position, validi ty of fitness certificates, authorisation of permits etc., in the selected offi ces. Further, Audit test-checked the.........
Debt Sustainability Analysis 2.9.7 54 66. Trend in Debt Sustainability indicators 2.9.8 55 67. Utilisation of Borrowed Funds 2.9.9 56 68. Status of Guarantees–Contingent Liabilities 2.10 5 7 69. Management of Cash Balances 2.11 58 70. Investment of Cash Balances 2.11.1 58 71. Conclusions.........
Wor ks related to nine projects costing ` 97.53 crore have not started due to delay in releas e of funds and finalization of tenders. Three projects sanctioned under SPA were s topped due to discontinuation of the scheme. (Paragraph 2.2.7.4) Out of 21 projects taken up in the test checked.........
Works related to ni ne projects costing ` 97.53 crore have not started due to delay in release of fund and fin alization of tender. Besides, three (3) projects 6 sanctioned under Special Plan Assistance (SPA) dur ing 2014-15 at a total estimated cost ` 96.12 crore had stopped due to.........
However it was shown that a total of 2978561.07 cum (174 per cent above Tender Agreement quantity) of the component was already ex cavated, when only 70.784 km length of road could be completed by the Division. An excess quantity of 1890834.04 cum was excavated, entailing excess expenditure.........
C HAPTER – VI E CONOMIC S ECTOR (S TATE P UBLIC S ECTOR U NDERTAKINGS ) 89 6.1 Functioning of Public Sector Undertakings 6.1.1 Introduction As of 31 March 2019, there were seven Public Sector Undertakings (PSUs) (all Government Companies) in...
Expenditure of ` 2.54 crore 18 4 3.2.2 Delay in accord of technical sanction by more than 15 days stipulated timelines 18 7 3.2.3 Invitation of tender prior to Administrative/Technical Approval 188 3.2.4 Opening of financial bids before TS 189 3.2.5 Short term tenders 19 0 3.2.6 Restrictive.........
The Government stated (March 2020) that after completing the buildings, procurement of equipment could not be done despite publishing several tender notices and, therefore, the laboratories could not be made functional. In the meantime, APEDA can celled the project on the basis of techno.........
Financial Bid opened before TS (days) Date on which CB executed Delay in finalisation of bond against prescribed 52 days Estimated cost (` in crore) Tendered Cost (` in Crore) Contracted Rate ( Per cent above) Cost of work as per NIT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 Bahraich 03/SE -INBC/BBK/.........
was marred with procedural irregularities as well as time and cost overruns on account of over -estimation in DPRs, calling of Notice Inviting Tenders (NITs) before technical sanctions, delays in execution of contract bonds despite availability of fund, un due benefit to the contractors and.........
(Paragraph 2.3.1) In case of 11 out of 13 contracts, Notice Inviting Tender ( NITs ) were invited by INB circles 34 to 162 days prior to Technical Sanction ( TS ) by the competent authorities and the financial bids were also opened up to 59 days prior to the dates of according TS. Further,.........
audited units/ Departments, in most of the cases, do not submit timely and satisfa ctory reply as indicated below: 1.4.1 Inspection Reports (IRs) The status of outstanding IRs (as on 30 September 2020) issued up to 31 March 2019 to 4,619 Drawing and Disbursing Officers (DDOs) pertaining to 48.........
The Report No. 1 of 2021 of the Comptroller and Auditor General of India for the year ended 31 March 2019 (Economic Sector and Public Sector Undertakings), Government of Uttar Pradesh has been prepared under Article 151 (2) of the Constitution of...
permit the Department to deduct security amount at the rate of 10 per cent from each running bill for work done till the required 10 per cent of the tender amount is reached including earnest mo ney deposited along with the tender. The Authority awarded (May 2010 9 and June 2011 10) two contracts.........
mber 2019) and charge -sheets have been issued (June 2020) to three officials 6 who were found guilty of disposing of surplus e arth without inviting tender. Thus, due to non -compliance of its own order, the Company caused an avoidable expenditure to GoUP and loss of revenue to the State.........
the State Government may by general or special order declare the area or areas which may be lea sed out by auction or by e -tender or by auction -cum tender or e -auction. Further, Rule 23(3) , stipulates that on such declaration, Chapter III 6 of the said Rules shall not apply to the area in.........
CHAPTER -II: STATE EXCISE 2.1 Tax administration Various kinds of liquor, such as Country Liquor (CL) and Indian Made Foreign Liquor (IMFL) are manufactured from alcohol. Excise duty on production of alcohol and liquor in distilleries and breweries...
Appendices 59 APPENDIX -I Non -realisation of revenue due to concealment of quantity of consum ed excise material and interest thereon (Reference Para No. 2.3) Types of Excise material Financial Year Unit Consumption as per ITR Consumption as per...
The Project Director (MIDH) stated (February 2020) that the tenders for purchase of imported planting material have been floated (Janua ry 2020). However, no specific studies for impact assessment of already distribute d plants had been conducted by the Department. 2.1.10 Integrated Pest.........
The procurement of estimated value of ` 10 lakh or above shall be made through advertised tender system. Under the ‘Atal School Vardi Yojana 5’ the State Government provides free-of-cost school uniform cloth to all students 6 of Government schools. The specifications of the school.........
Overview vii This Report contains two performance audits on (i) Working of Horticulture Department and (ii) Solid Waste Management in Urban Areas and 14 compliance audit paragraphs, involving a total financial impli cation of ` 203.01 crore. Some of ...