Page 14 of 54, showing 10 records out of 538 total
Particulars Page No. Preface ix Executive Summary xi Chapter-1 Introduction 1.1 Public health facilities in the State 1 1.2 Planning and Execution of Performance Audit 3 1.2.1 Audit Objectives 3 1.2.2 Audit Criteria 3 1.2.3 Audit scope and methodology 4 1.2.4 Performance Indicators 4 1.2.5............
The test checked hospitals also did not estab lish an Effluent Treatment Plant for pre-treatment of Bio-Medical waste, resulting i n its drainage directly in the sewerage system, which was not only hazardous to th e public health but also violated the BMW Rules. Besides, protective gears/e............
GoI had also provided compensation for loss on account of rolling out GST amounting to `2,866 crore as grants-in-aid. However, own tax reve nue during 2018-19 fell short of the assessment made by XIV FC ( `74,926 crore). Non-Tax Revenue Details of non-tax revenue, its trend and growth du ring............
(-)10.87 Special Securities Issued to NSSF 23.17 11.57 (-)14.33 (-)15.01 (-)16.27 Loans from Financial Institutions 13.68 (-)37.45 3.71 172.85 40.35 Compensation and other Bonds (-)4.56 (-)4.56 0.00 0.00 0.00 Small Savings, PF, etc. 310.74 383.36 62.75 (-)179.14 (-)361.19 Deposits and Advances............
Revenue expenditure increased by ` 1,529.01 crore (14.03 per cent) over the previous year mainly due to acquisition of land and payment of compensation ( ` 230 crore), maintenance of roads and bridges ( ` 349.63 crore), purchase of power ( ` 254.01 crore), urban development ( ` 128.43............
Bio-medical waste management plants were lying non- functional and defunct in all five DHs except Pasighat. Performance Audit of Select District Hospitals in Arunachal Pradesh x Laundry services were also highly inadequate as the re was a shortage/non– availability of 13 to 21 types of............
Important findings are as under: Haryana Power Generation Corporation Limited The Company paid ` 27.29 crore as compensation for short lifting of Overview ix coal during 2016-17, as it did not initiate timely action for reduction of Annual Contracted Quantity of coal with Coal India............
incorporat ed as bus body building workshop for Haryana Roadways; Haryana Rail Infrast ructure Development Corporation Limited incorporated for planning and i mplementation of railway infrastructure on behalf of State Government. Chapter IV-Functioning of Public Sector Undertakings (Other............
amount given by GoP during the period 2011-12 to 2018-19 out of which ` 38,211.76 crore was given to Power Sector PSU (PSPCL) on account of tar iff compensation for subsidised supply of power to the consumers and ` 465.32 crore (out of ` 2,546.96 crore) to other than Power Sector PSUs fo r the............
any allottee-wise le dger for keeping a track of the outstanding amount recoverable towards allot ment price, extension fee and enhancement compensation to ensure its timely p ursuance and recovery as per the terms of allotment. The Company had also no t framed any Management Information............
Grants-in-aid of `11,107 crore include compensation of `7,129 crore for loss of revenue arising out of impl ementation of Goods and Services Tax. 42.06 20.87 20.38 2.58 2.75 1.55 9.81 ` ` ` ` goes to General Services (Revenue)Social Services (Revenue)Economic Services (Revenue)Grants in............
-Education, Sports, Art and Culture 9312.39 10102.59 (iv) Non-Plan Grants 0.00 0.00 -Health and Family Welfare 2746.45 3143.38 (v) Grants for State Plan Schemes 0.00 0.00 -Water Supply, Sanitation, Housing and Urban Development 764.72 957.98 (vi) Grants for Central Plan and Centrally Sponsored............
2 of 2019 i TABLE OF CONTENTS Particulars Paragraph(s) Page(s) Preface vii Executive Summary ix CHAPTER I: ECONOMIC SECTOR Introduction 1.1 1 Planning and conduct of audit 1.2 2 Response of the Government/departments towards audi t 1.3 2 AGRICULTURE DEPARTMENT Agriculture Department 1.4 4............
(Tripura Jute Mills Limited: six, Tripura Small Industries Corporation Limited: four), three to Forest Department (Tripura Forest Development & Plantation Corporatio n Limited), and one each to Transport Department (Tripura Road Transport Corpor ation) and Tribal Welfare (Tribal............
Government of Od isha and Government of Jharkhand demanded compensation on account of mining beyond q uantity permitted under Environmental Clearance/ Consent to operate by the Iron ore and Limestone mines under Raw Material Division. Delay in surrender of excess Railway land at Bolani at............
were also not being verified by GeM. Management in its reply (February 2020) stated that GeM is planning to allow the sellers to attach all statutory documents in the bid for verif ication by the buyers and that the documents may expire during the tenure of service contract pe riod which will............
Report No. 18 of 2020 188 dustandesh Dredging Corporation of India Limited 12.1 Non-safeguarding of financial interests under dredging contract Dredging Corporation of India Limited failed to saf eguard its financial interests under a dredging...