The office of the Principal Director of Audit, Railway Production Units & Metro Railway is a subordinate office under the Comptroller & Auditor General of India with headquarters at Kolkata.

The Principal Director of Audit, Railway Production Unit & Metro Railway is responsible for the audit of accounts and various activities relating to: 

  1. Banaras Locomotive Works, Varanasi: Laying of foundation stone of Banaras Locomotive Works by the first President of India Late Dr. Rajendra Prasad was done on 23rd April 1956. In August 1961 Banaras Locomotive Works (erstwhile Diesel Locomotive works) came into existence. First Broad-Gauge Locomotive (WDM-2) released by (Late) Shri Lal Bahadur Shastri in January 1964, first Meter Gauge Locomotive (YDM-4) released by (Late) Shri Morarji Desai on 22 November 1968 and first Broad-Gauge Shunting locomotive (WDS-6) turned out in February 1975. In March 2020 first ever dual traction locomotive turned out. Branch Audit Office at Banaras Locomotive Works is housed in the Administrative Building and is headed by a Group Officer. The function of this branch office is to audit the accounts and other activities of Banaras Locomotive Works.

  2. Chittaranjan Locomotive Works, Chittaranjan: Chittaranjan Locomotive Works (CLW) has been named after the great freedom fighter, leader and statesmen Deshbandhu Chittaranjan Das. The production activity started on 26th January 1950 the day when India became Republic. The initial product of Chittaranjan Locomotive Works was Steam Locomotive. It has transformed itself from being a manufacturer of Steam Locomotives to that of Diesel locomotives and finally to Modern, high power, Electric Locomotives. The venture has paid off and at present CLW is proudly producing state-of-the-art 3-phase locos with all modern features of latest “Insulated Gate Bipolar Transistor” (IGBT) technology. Branch Audit Office at Chittaranjan Locomotive Works is housed in the Administrative Building and is headed by a Group Officer. The function of this branch office is to audit the accounts and other activities of Chittaranjan Locomotive Works.

  3. Metro Railway, Kolkata: It is located at the Headquarters' Office of the Principal Director of Audit, Railway Production Units & Metro Railway, Kolkata and is headed by the Principal Director of Audit. The function of this branch office is to audit the accounts and other activities of Metro Railway, Kolkata.To solve the transportation problems of the people of Kolkata, a Rail- borne Rapid Transit System in the form of underground Railway (first of its kind in Indian Railway) was proposed and the construction of Metro Railway, Kolkata started in 1972. India’s first Metro became a reality on October 24, 1984, with a partial service on 3.40 Km between ESPLANADE and BHOWANIPUR (Now NETAJI BHAVAN). Gradually the 25.13 km section from DUM DUM to KAVI SUBHAS with 23 Stations became operational in 2011. Metro Railway, Kolkata has since been declared as a Zonal Railway in December 2010. The total planned network of metro railway in the state is 125.320 Km. Out of this, as of March 2024, 58.680 Km are operational as below:

Name of the Line

From

To

Length in Km

Blue line

Kavi Subhash

Dakshineswar

32.250

Green line

Salt-Lake Sector V

Sealdah

13.000

Esplanade

Howrah Maidan

Purple line

Joka

Majherhat

7.750

Orange Line

Kavi Subhash

Hemanta Mukhopadhyay

5.680

  1. Three Public Sector Undertakings (Railways) 
    1. Kolkata Metro Rail Corporation Ltd (KMRCL)
    2. Braithwaite & Co Ltd (BCL).
    3. Braithwaite NACOF Solar Project Limited (NACOF):  A subsidiary of BCL incorporated on 05.01.2023.